Welcome to the Club Penguin Wiki! Log in or Create an account to join the community!
Ski Lift
The Ski Lift is the path that connects the Mountain and the Ski Village. It is hardly ever decorated during parties, but has been the site of some important events in Club Penguins history.
A prototype of the current Ski Lift was the Ski Lift 1000, designed by Gary. It appears to have been very similar to the current Ski Lift, except for the fact that it was much faster and more dangerous.
Parties
- During the 2008 Medieval Party, the Ski Lift became a staircase.
- The Ski Lift became a water slide during the Summer Kick Off Party in June 2008.
- During the April Fools Party 2008, the lift had a pair of underwear hanging from them.
Involvement in Missions
- In the PSA Secret Mission #4, Avalanche Rescue, the Ski Lift breaks down. You need to get a belt to fix it.
- In all of the Secret Missions that take place after the mission in which it is repaired, one can still see the belt used to repair it. This also can be seen in Club Penguin: Elite Penguin Force.
Gallery of Ski Lift
-
View of Ski Lift from Mountain.
-
View of Ski Lift from Ski Village.
-
Part of Ski Lift in the Summer Kick Off Party.
-
The Ski Lift run by a belt, as seen here in a Mission.