Welcome to the Club Penguin Wiki! Log in or Create an account to join the community!

Ninja Construction: Difference between revisions

From the Club Penguin Wiki, the free, editable encyclopedia about Club Penguin
Jump to navigation Jump to search
imported>EddieStilson
No edit summary
imported>Code1125
Undo revision 322580 by EddieStilson (talk)
Line 2: Line 2:
{{archive}}
{{archive}}
[[File:SenscavHIDEOUT.png|thumb|Phase 1 of the Construction.]]
[[File:SenscavHIDEOUT.png|thumb|Phase 1 of the Construction.]]
The '''Ninja Construction''' was an event that happened on at the [[Ninja Hideout]]. It resulted in the opening of the [[Fire Dojo]] and the release of [[Card Jitsu Fire]]. It started as the same time as [[Sensei's Scavenger Hunt]]. The Construction followed the Fire Scavenger Hunt.
The '''Ninja Construction''' was an event that happened on at the [[Ninja Hideout]]. It resulted in the opening of the [[Fire Dojo]] and the release of [[Card Jitsu Fire]]. It started as the same time as [[Sensei's Scavenger Hunt]].


==Incident==
==Trivia==
The Ninja Construction took place during the very controversial 2009 CP Presidential Elections, in which Democrat Barquack Crowbama, popular with both the Democrats and members of the communist Membership Party, ran against Republican Eddie Stilson, a strong supporter of the abolition of membership, and thus favored by the East Side Anarchists. Club Penguin Police and Republican motorcycle gangs guarded the perimeter in order to prevent any trouble. Despite their efforts, several West Side Communists infiltrated the Dojo, spray-painting graffiti which said "Crowbama '09", "Communism", and "Non-members leave CP". They also managed to plant a bomb which blew up the southeast wall of the dojo, causing approximately $500,000 in damage. Those who managed to avoid arrest were later confronted by angered Anarchists, resulting in the largest CP flame war in 2 years. 5 Communist Penguinssnd 2 Anarchist Penguins died.
*The Construction followed the [[Sensei's Scavenger Hunt|Fire Scavenger Hunt]].
*There might be future [[Water|water]] and [[Snow|snow]] construction.
*As seen in a [[The Club Penguin Times|newspaper]] issue, the hole in the [[Ninja Hideout]] was replaced with the three tiles, which is now an [[amulet]].
[[File:New_ninja_hideout.jpg|thumb|Phase 2 of the Construction.]]
[[File:New_ninja_hideout.jpg|thumb|Phase 2 of the Construction.]]



Revision as of 01:12, 17 May 2010

Phase 1 of the Construction.

The Ninja Construction was an event that happened on at the Ninja Hideout. It resulted in the opening of the Fire Dojo and the release of Card Jitsu Fire. It started as the same time as Sensei's Scavenger Hunt.

Trivia

Phase 2 of the Construction.

See Also