Welcome to the Club Penguin Wiki! Log in or Create an account to join the community!
Ninja Construction
Jump to navigation
Jump to search
![]() |
This page is incomplete! This page is a stub. You can help by expanding it as soon as possible, then removing this tag. |
Archived This article is about something that was for a period of time, or is no longer, in Club Penguin. |

The Ninja Construction was an event that happened on at the Ninja Hideout. It resulted in the opening of the Fire Dojo and the release of Card Jitsu Fire. It started November 13 in 2009.
Trivia
- The Construction followed the Fire Scavenger Hunt.
- As seen in the #213 newspaper issue[1], the hole in the Ninja Hideout was replaced with the three tiles, which is now an amulet.
