Welcome to the Club Penguin Wiki! Log in or Create an account to join the community!

Ninja Construction: Difference between revisions

From the Club Penguin Wiki, the free, editable encyclopedia about Club Penguin
Jump to navigation Jump to search
imported>Hat Pop
No edit summary
imported>Error504
No edit summary
Line 1: Line 1:
{{stub}}
{{stub}}
[[File:SenscavHIDEOUT.png|thumb|Phase 1 of the Construction]]
[[File:SenscavHIDEOUT.png|thumb|Phase 1 of the Construction.]]
The '''Ninja Construction''' was an event that happened on at the [[Ninja Hideout]]. It resulted in the opening of Card Jitsu Fire.
The '''Ninja Construction''' was an event that happened on at the [[Ninja Hideout]]. It resulted in the opening of [[Card Jitsu Fire]].


==Trivia==
==Trivia==
Line 7: Line 7:
*There might be future [[Water|water]] and [[Snow|snow]] construction.
*There might be future [[Water|water]] and [[Snow|snow]] construction.
*As seen in a [[The Club Penguin Times|newspaper]] issue, the hole in the Hideout was replaced with the three tiles.
*As seen in a [[The Club Penguin Times|newspaper]] issue, the hole in the Hideout was replaced with the three tiles.
[[File:New ninja hideout.jpg|thumb|Phase 2 of the Construction]]
[[File:New_ninja_hideout.jpg|thumb|Phase 2 of the Construction.]]


== See Also ==
== See Also ==

Revision as of 20:00, 4 February 2010

Phase 1 of the Construction.

The Ninja Construction was an event that happened on at the Ninja Hideout. It resulted in the opening of Card Jitsu Fire.

Trivia

  • The Construction followed the Fire Scavenger Hunt.
  • There might be future water and snow construction.
  • As seen in a newspaper issue, the hole in the Hideout was replaced with the three tiles.
Phase 2 of the Construction.

See Also