Welcome to the Club Penguin Wiki! Log in or Create an account to join the community!

Ninja Construction: Difference between revisions

From the Club Penguin Wiki, the free, editable encyclopedia about Club Penguin
Jump to navigation Jump to search
imported>Bla87
No edit summary
imported>Hat Pop
No edit summary
Line 1: Line 1:
{{stub}}
{{stub}}
[[File:SenscavHIDEOUT.png|thumb|Phase 1 of the Construction]]
[[File:SenscavHIDEOUT.png|thumb|Phase 1 of the Construction]]
The '''Ninja Construction''' was an event that happened on at the [[Ninja Hideout]]. It resulted in a floor mosaic of the three [[Card Jitsu]] Elements being constructed and many fiery items being thrown into a pit.
The '''Ninja Construction''' was an event that happened on at the [[Ninja Hideout]]. It resulted in the opening of Card Jitsu Fire.


==Trivia==
==Trivia==
*The Construction followed on from the [[Sensei's Scavenger Hunt|Fire Scavenger Hunt]].
*The Construction followed the [[Sensei's Scavenger Hunt|Fire Scavenger Hunt]].
*The new room is where the [[Volcano]] is.
*There might be future [[Water|water]] and [[Snow|snow]] construction.
*There may be a future [[Water|water]] scavenger hunt and a [[Snow|snow]] scavenger hunt.
*As seen in a [[The Club Penguin Times|newspaper]] issue, the hole in the Hideout was replaced with the three tiles.
*And if there is a [[Water|water]] scavenger hunt then the [[Waterfall]] might be involved.
*As seen in a [[The Club Penguin Times|newspaper]] issue, the hole in the Hideout is replaced with an elevator.
[[File:New ninja hideout.jpg|thumb|Phase 2 of the Construction]]
[[File:New ninja hideout.jpg|thumb|Phase 2 of the Construction]]



Revision as of 22:33, 1 February 2010

Phase 1 of the Construction

The Ninja Construction was an event that happened on at the Ninja Hideout. It resulted in the opening of Card Jitsu Fire.

Trivia

  • The Construction followed the Fire Scavenger Hunt.
  • There might be future water and snow construction.
  • As seen in a newspaper issue, the hole in the Hideout was replaced with the three tiles.
Phase 2 of the Construction

See Also