Welcome to the Club Penguin Wiki! Log in or Create an account to join the community!
Construction Sites
There have been many construction sites in Club Penguin. They usually occur before parties or when re-constructing or building a new room. During this time, penguins may drill with hard hats and mining helmets more frequently, and there are signs that say "PENGUINS AT WORK" or something similar.

Construction Utilities
Items
These or similar items are usually seen at construction sites, weather they're being worn by penguins or they're just laying around the site.
-
One of the most used symbols for construction, the Miners Helmet is usually given as a free item at major construction sites.
-
Hard Hat- Another construction hat often seen on penguins at construction sites.
-
Red Hard Hat- Rarest of the hard hats, it was given to penguins who participated in CPIP, and is rarely seen on construction sites anymore.
-
Another construction sign
Other
-
A Snow Trekker, a vehicle used for construction since Penguin Chat 3
Major construction events
Construction of The Stage
-
The start of construction.
-
The stage almost complete.
-
The Plaza during the Surprise Party 2007, right after construction ended.
The construction of The Stage occurred in late 2007. What makes the project major is that the entire building was built from scratch.
Earthquake
- See main article: Earthquake
-
The Town
The Earthquake was a Natural Disaster that occurred in June 2008, and was caused by the actions of Herbert P. Bear and his Earthquake Driller. It also is the main reason for PSA Secret Mission 7: Mysterious Tremors.
Dig Out the Dojo
- See main article: Dig Out the Dojo
-
The Dojo during construction.
-
Dojo Courtyard snow clearing Part 1.
-
Dojo Courtyard snow clearing Part 2.
Dig Out the Dojo was a large construction project in November 2008. Before then, the Dojo had been covered in snow, so you couldn't see the exterior. However, The Great Storm of 2008 damaged the roof of the Dojo and lead to the exterior being cleared of snow, and the roof being repaired. After construction was complete the Dojo Grand Re-Opening occurred and Card-Jitsu was released.
Other Dojo projects
- See related articles: Sensei's Scavenger Hunt and Water Hunt.
-
Ninja Hideout during renovation; September 2009
-
Ninja Hideout during the construction of the Fire Dojo; November 2009
-
Ninja Hideout during Water Dojo construction; November 2010
-
The Water Dojo during construction; November 2010
There have been construction projects at the dojo at times other than Dig Out the Dojo. Construction usually happens whenever a new elemental dojo is built.
Festival of Flight
- See main articles: Water Party 2007, Festival of Flight
-
The main construction during the Water Party 2007.
-
The main construction during the Festival of Flight.
Although the Water Party 2007 and Festival of Flight were parties, their main purpose was to fix the windows in the Cave, which threatened to break if left unattended.
Pet Shop renovation
-
The Plaza during Pet Shop renovation.
-
The Pet Shop before renovation.
-
The Pet Shop during renovation.
-
The Pet Shop after renovations were complete.
The Pet Shop renovation occurred in March 2011, and was directed PH. It was renovated to make it more fun and interactive for the puffles. It was released along with the new design for the Puffle Card and the game Puffle Launch.
Everyday Phoning Facility reconstruction
- See related articles: Popcorn Explosion, Battle of Doom, Operation: Blackout, EPF Reconstruction
-
Repairing of the Sport Shop building days after the initial Popcorn Explosion; May 2010.
-
Repairs on the EPF Rooftop after the Battle of Doom; June 2011.
-
The Ski Village during Reconstruction; February 27th, 2013.
-
The Everyday Phoning Facility during Reconstruction; February 27th, 2013.
-
The EPF headquarters during Reconstruction; February 27th, 2013.
The Everyday Phoning Facility building has had to be reconstructed/repaired three times.
- The first time was in May 2010, after the Popcorn Explosion.
- The second time was in June 2011, after the Battle of Doom.
- The third (and most recent) repair to the building was a total re-construction that occurred in February and March 2013. The Everyday Phoning Facility and the EPF Headquarters had to be re-built after Herbert blew the rooms up with a bomb in November 2012.
Gallery of construction
-
The Lighthouse when the performance stage was being built.
-
The Cove when the Surf Hut was being built; June/July 2007
Construction sites before parties
-
St. Patrick's Day Party 2009 - Cove
-
Forest
-
Ski Village
-
Adventure Party 2009 - Beach
-
Cove
-
Dock
-
Forest
-
Plaza
-
Snow Forts
-
Town
-
Music Jam 2009 - Dock
-
Forest
-
Ski Village
-
Snow Forts
-
Cove
-
Beach
-
Lighthouse
-
Iceberg
-
Coffee Shop
-
Soccer Pitch
-
Festival of Flight - Beach
-
Beacon
-
Dock
-
Forest
-
Plaza
-
Snow Forts
-
Town
-
The Fair 2009 - Lighthouse
-
Cave Expedition - Mine
-
Puffle Party 2010 - Cave
-
Forest
-
Beacon
-
Iceberg
-
Dance Club
-
Mine
-
Lighthouse
-
Medieval Party 2010 - Town
-
Plaza
-
Snow Forts
-
Beach
-
Cave
-
Ski Village
-
Island Adventure Party 2010 - Town
-
Plaza
-
Beach
-
Cove
-
Music Jam 2010 - Beach
-
Coffee Shop
-
Cove
-
Dock
-
Forest
-
Iceberg
-
Lighthouse
-
Ski Village
-
Snow Forts
-
The Fair 2010 - Beach
-
Puffle Party 2011 - Beacon
-
Box Dimension
-
Cave
-
Dance Lounge
-
Forest
-
Iceberg
-
Lighthouse
-
Mine
-
Night Club
-
April Fools' Party 2011 - Beach
-
Dock
-
Box Dimension
-
Iceberg
-
Ski Village
-
Snow Forts
-
Medieval Party 2011 - Beach
-
Cave
-
Plaza
-
Ski Village
-
Snow Forts
-
Town
-
Music Jam 2011 - Beach
-
Coffee Shop
-
Cove
-
Dock
-
Forest
-
Iceberg
-
Lighthouse
-
Ski Village
-
Snow Forts
-
Island Adventure Party 2011 - Beach
-
Cove
-
Plaza
-
Town
-
The Great Snow Race - Ski Village
Trivia
- There is also a Card Jitsu power card featuring a construction site.