Welcome to the Club Penguin Wiki! Log in or Create an account to join the community!

Ninja Construction: Difference between revisions

From the Club Penguin Wiki, the free, editable encyclopedia about Club Penguin
Jump to navigation Jump to search
imported>NickelbackFan37
imported>Grande Yoda
No edit summary
 
(21 intermediate revisions by 16 users not shown)
Line 1: Line 1:
{{stub}}
{{stub}}
[[File:SenscavHIDEOUT.png|thumb|Phase 1 of the Construction]]
{{archive}}
The '''Ninja Construction''' was an event that happened on at the [[Ninja Hideout]]. It resulted in a floor mosaic of the three [[Card Jitsu]] Elements being constructed and many fiery items being thrown into a pit.
[[File:SenscavHIDEOUT.png|thumb|Phase 1 of the Construction.]]
The '''Ninja Construction''' was an event that happened on at the [[Ninja Hideout]]. It resulted in the opening of the [[Fire Dojo]] and the release of [[Card Jitsu Fire]]. It started November 13 in 2009.


==Trivia==
==Trivia==
*The Construction followed on from the [[Sensei's Scavenger Hunt|Fire Scavenger Hunt]].
*The Construction followed the [[Sensei's Scavenger Hunt|Fire Scavenger Hunt]].
*The new room might be where the [[Volcano]] is.
*As seen in the #213 [[The Club Penguin Times|newspaper]] issue<ref>http://archives.clubpenguinwiki.info/static/images/archives/4/46/ClubPenguinTimes213.swf</ref>, the hole in the [[Ninja Hideout]] was replaced with the three tiles, which is now an [[amulet]].
*There may be a future [[Water|water]] scavenger hunt and a [[Snow|snow]] scavenger hunt.
[[File:New ninja hideout.jpg|thumb|Phase 2 of the Construction.]]
*And if there is a [[Water|water]] scavenger hunt then the waterfall might be involved.
*As seen in a [[The Club Penguin Times|newspaper]] issue, the hole in the Hideout may be replaced with an elevator.
[[File:New ninja hideout.jpg|thumb|Phase 2 of the Construction]]


== See Also ==
== See also ==
*[[Sensei's Scavenger Hunt]]
*[[Construction Sites]]


*[[Sensei's Scavenger Hunt]]
==Sources and References==
{{reflist}}
[[Category:Events]]
[[Category:Events]]
[[Category:Current Events]]
[[Category:Ninjas]]
[[Category:Ninjas]]
[[Category:Club Penguin]]
[[Category:Dojo]]
[[Category:Dojo]]

Latest revision as of 21:42, 2 May 2014

Phase 1 of the Construction.

The Ninja Construction was an event that happened on at the Ninja Hideout. It resulted in the opening of the Fire Dojo and the release of Card Jitsu Fire. It started November 13 in 2009.

Trivia

Phase 2 of the Construction.

See also

Sources and References